Scope of Work:
- Installed water and sewer lines dedicated to the water cooler and ice machine for efficient operation.
- Repiped floor drains and installed new additions for improved drainage and sanitation.
- Installed trench drains to manage water flow effectively in designated areas.
- Ran water heater vents to ensure proper ventilation and safety.
- Installed necessary water lines to support the functioning of various fixtures and appliances.