Trinity Building and Design

Commerce Trust Project – Fifth Third Bank Babcock Ranch Branch

Commerce Trust

Scope of Work:

  • Assess and resolve hot water deficiency issue at Fifth Third Bank Babcock Ranch Branch.
  • Conduct trenching and layout planning for underground piping.
  • Install in-wall overhead water piping to optimize space and meet regulatory requirements.
  • Implement roof hydrant for emergency water access.
  • Provide and install toilets, sinks, and necessary fixtures.
  • Integrate and set up water heater to ensure consistent hot water supply.

Latest Projects

Construction industry at its finest

Get in touch with us for all your construction needs and inquiries.