Scope of Work:
- Worked on stormwater drain system for enhanced efficiency and drainage.
- Installed 4 sets of roof drains to mitigate water accumulation on the roof.
- Implemented a roof hydrant for emergency water access and firefighting capabilities.
- Conducted in-wall venting installation to optimize ventilation and maintain air quality within the structure.